TRI HARSO SULISTIYO

click here for Word Format

Summary of Experience:

Having almost 5 years experience as Mechanical Engineer, include more than 3.5 years in Engineering and Construction Projects. The responsibility are including in Proposal work, Front End Engineering Design (FEED) and Detail Engineering Designs for various projects such as, Oil Refinery and LNG project. Familiar with Pressure Vessel, Heat Exchanger, LNG & Condensate Tank, Air Fin Cooler, Filter, Reactor Design, Pump, and familiar also with Code like Australian Standard, ASME, API, ASTM, TEMA, PFD, P&ID etc, also familiar with under pressure work, work with another culture and ready to travel aboard.

 

Training / Course:

  • Atmospheric Storage Tank, P. Vessel and Heat Exchanger Calc. Training (PT JGC Indonesia)
  • Material selection, Requisition and Vendor Document Review Training (PT JGC Indonesia)
  • Hazard and Operability Study training, (PT JGC Indonesia)
  • CAD training with AutoCAD Software (PT JGC Indonesia)
  • Structure training with StaadPro software (PT JGC Indonesia)
  • ISO 9001: 2000, ISO 14001 & Fluid Machine training (UGM)

Languages:

  • Native language Bahasa Indonesia.
  • English.

Computer Ability

  • Engineering application (Compress, PV Elite, TANK, EDR, Staad Pro, NAVIS etc) and Microsoft application.

Employment History (Summary) :

  • PT PETROFAC IKPT INTERNATIONAL                                       May 2011 – Present
  • PT. JGC INDONESIA                                                                            January 2008 – April 2011

 

Career Highlights:

PT PETROFAC IKPT INTERNATIONAL

 

Turkmengas Project

Project        :  South Yoloten Gas Field Development

Duration      : May 2011 – present

Position      :  Mechanical Engineer

Client          :  Turkmengas

Value          :  $ 3.4 Billion

Responsibility and Scope of Works

  • Vendor Document review for Pressure Vessel, Filter, Deaerator, Pig Launcher
  • Prepare mechanical calc, loading data and mechanical datasheet

 

PT JGC INDONESIA

Gorgon LNG Project

Project        :  Gorgon LNG Project Barrow Island Australia

Duration      : January 2010 – April 2011

Position      :  Mechanical Engineer (Lead Assistant Eng)

Client          :  Chevron Australia

Value          :  A$ 43 billion

Responsibility and Scope of Works

  • Vendor Document review for LNG & Condensate Tank, Propane Sphere Tank and Shop Built Tank
  • Make a coordination with another discipline, vendor and client

 

Gundih Project

Project        :  Gundih Project (Proposal works)

Duration      : January – September 2010

Position      :  Mechanical Engineer (Lead Assistant Eng)

Client          :  PT Pertamina EP

Value          :  US $ 123 Million

Responsibility and Scope of Works

  • Prepare project spec summary for Pressure Vessel, H.E and atmospheric tank
  • Design and weight estimation for Pressure Vessel. Atmospheric tank, Heat Exchanger
  • Prepare Mechanical Data sheet for Reactor, Column, Drum, HE, AFC, Filter and Atmospheric tank
  • Prepare for Technical Bid Evaluation, Vendor Clarification and Vendor Document Review
  • Prepare Requisition for Column, Drum and Reactor
  • Prepare for Technical Bid Evaluation and BMBQ

 

Tangguh LNG Project

Project        :  Tangguh LNG Project (Add. EPC Works)

Duration      : April – December 2009

Position      :  Mechanical Engineer

Client          :  BP Berau

Value          :  US $ 500 thousand

Responsibility and Scope of Works

  • Design and weight estimation for Stainless Steel Pressure Vessel
  • Prepare and Review Engineering Drawing
  • Prepare Mechanical Data Sheet, Requisition and Vendor Document Review
  • Process Equipment Modification for existing plan (Vortex Breaker Modification, platform clip modification)

 

KNPC NRP Project

Project        :  Kuwait National Petroleum Company (KNPC), New Refinery Project (EPC Works)

Duration      : May 2008 – March 2009

Position      :  Mechanical Engineer

Client          :  KNPC

Value          :  US $ 15 Billion

Responsibility and Scope of Works

  • Design and Weight Estimation for Pressure Vessel with Compress software (64 P.V. for early work)
  • Detail Design and Weight Estimation for  Pressure Vessel (40 P.V for EPC Work)
  • Prepare and Review Engineering Drawing (40 Eng. Dwg.)
  • Prepare Nozzle list for all item (Reactor, Column, Drum, Filter Separator, Shell Tube Heat Exchanger, and Air Cooler
  • Nozzle load calculation checking with WRC 107

Donggi Senoro Project

Project        :  Donggi Senoro Project (FEED Works)

Duration      : January – June 2008

Position      :  Mechanical Engineer

Client          :  PT Pertamina, PT Medco E&P, Mitsubishi

Value             US $1.4 billion

Responsibility and Scope of Works

  • Design and Weight Estimation for Pressure Vessel with Compress software
  • Prepare Mechanical Data Sheet

Previous Project in Gadjah Mada University and Islamic University of Indonesia

6 months to develop a laboratory system in UII, the scope of work that is done making procedures to conduct a test in the laboratory.

One year at Gadjah Mada University laboratory, helping to research on the influence of friction between the carbon materials and toothbrush. In addition it also conducted research and comparison for gear pump and plunger pump with the working fluid shell tellus oil.

ASTRA OTOPARTS TBK, NUSA METAL DIVISION (APPRENTICESHIP, SEP 2003 – MARCH 2004)

Optimized the equipment in the factory such as improved for shooter and jig design for trimming process, support for the engineer in a vacuum equipment project for high pressure die casting process.

Design for improvement the product, transmission case for Mitsubishi, crankcase for Suzuki motorcycle, also develop new project line for wheel assy assembly.